I was sent these by the same person who told the me O'Dome renovation was going to be pushed back several weeks before UF made it public.
With the design finished, this is what the new IPF will look like:
This post was edited on 4/17 7:42 PM by Mark Wheeler
With the design finished, this is what the new IPF will look like:
This post was edited on 4/17 7:42 PM by Mark Wheeler